|
|
| Name of Institution | Marist Brothers Secondary School | Chemhanza High School | St. Albert's High School | L.C.B.L. Candidates’ House | Nagle House School | |
| Type of institution | Coeducational Boarding School | Coeducational Boarding School | Coeducational Boarding School | Training Centre | For girls from child-headed and one-parent families | |
| GPS co-ordinates | S 18° 34' 00.8" | S 18º 36’ 12.8” | S 16º 28’ 33.3” | S 17º 31’ 19.3” | S 18º 11' 51.2" | |
| E 026° 50' 37.0" | E 031º 33’ 57.5” | E 031º 17’ 09.0” | E 031º 15’ 21.0” | E 031º 31' 43.2" | ||
| Physical address | Chezhu Village, Dete (in Hwange District) | Chemhanza Farm, Wedza Growth Point | Centenary | Makumbi Mission | Caringon Avenue Marondera | |
| Postal address | P.O.Box 13 Dete | Box 58 Wedza | Bag 9047 Centenary | P.O. Box 4230, Harare | P/Bag 3804 Marondera | |
| Telephone | +263-22-2279/2336 | +263-11-869166 | +263 79 23370 | |||
| Fax | ||||||
| Cell phone | ||||||
|
presentationsisters @zol.co.zw |
||||||
| Contact person | Mr. Alois Lazaros Kativhu | Mr. Thomas Chitongo | Fr. Vitalis Murombedzi | Sr Regina Kunze | Sr Anna Manyonga | |
| Designation | Headmaster | Headmaster | Responsible Authority | Sister Superior | Deputy Head of School | |
| Applied in | May 2006 | June 2006 | May 2008 | May 2008 | July 2008 | |
| Number of beds | 300 | 400 | 600 | 13 | 12 | |
| Owner | Marist Brothers | Methodist Church | Diocese of Chinhoyi | L.C.B.L. Sisters | Presentation Sisters | |
| Funding comes from | School fees | School fees, Parents | School fees, Parents | Congregation, Benefactors, Catholic church | Congregation, Benefactors, Catholic church | |
| Existing water heating | None | Electricity | None | None | Electricity | |
| Sufficient cold water | Yes | Yes | Yes | No | Yes | |
| Cold water from | Borehole | ZINWA | Borehole | Dam | Municipality, borehole | |
| Reliability of electricity | 80% | 50% | 30% | 30% | 30% | |
| Solar water heating needed | for the winter months to provide warm showers to pupils suffering from asthma and skin problems | get hot water to dormitories and at the same time reduce consumption of electricity | Get hot water to dormitories as there is no water heating | To bring heated water to the training centre | Replace the defunct geysers of the school kitchen and the convent | |
| Maintenance staff | unqualified | unqualified | unqualified | unqualified | unqualified | |
| Recommended capacity of solar hot water system | 2 x 300 litres, indirect, thermosyphon | 1 x 1000 litres, direct, thermosyphon | 3 x 1000 litres, direct, thermosyphon | 1 x 440 litres, direct, thermosyphon | 1 x 440 litres, 1 x 305 litres, thermosyphon | |
| Estimated cost [EURO] | 7,000.00 | 5,000.00 | 15,000.00 | 4,000.00 | 7,500.00 | |
| Recommended for funding | YES 50% | YES 50% | YES 50% | YES 50% | YES 50% | |
| Official opening in | 1972 | |||||
| List of former donors | Misereor (Germany), USA, Austria, Canada, Spain, Missio | Methodist Church | Jesuit Mission | Jesuit Mission (Germany) | Ireland, South Africa, Catholic Church |